When a neighbourhood floods, the cause is often a decision taken a decade earlier, several kilometres uphill, by someone who never saw the consequence.

71.31 ha

water lost in one catchment

35.9%

of the blue grid, gone

84

cited corpus chunks

Top 4

of 68 teams

Open the live demo
ROLE
Product
CONTEXT
Plaksha University, Top 4 of 68
DATA
JRC : Landsat : MERIT Hydro : Dynamic World
STATUS
Live, evidence tool

The problem

The water still arrives. The storage no longer does.

Bengaluru was built on a cascade of man-made tanks. Rain fell on high ground, filled the first tank, overflowed down a channel into the next, and so on down the valley. The tanks were the storage, the channels were the plumbing, and together they were a drainage system that needed no pumps.

Over four decades tanks were drained and built over, and channels were culverted, narrowed or filled. By the time the water is in somebody's ground floor, the evidence that a lake was ever there has been paved over. The record is not gone, though - it is in orbit.

My thinking

The tempting build is a flood predictor. It is also the one that falls apart under questioning.

OPTION 01

Predict the flooding

Forecast depth, extent and probability for a given site. It is the demo everyone expects from this problem statement, and it wins the room in the first thirty seconds.

It needs the drain network, a fine elevation model, a local rainfall curve and a hydraulic solver. None of those are derivable from satellite imagery, so the number would look exactly like a measurement and not be one.

OPTION 02Chosen

Build an evidence tool and refuse the rest

State what was there, what is there now, what was built on the difference, where the displaced water goes, and what the site could hold instead. Decline everything beyond that explicitly, inside the answer itself.

We took this one. Naming the four things a flood prediction would require is more useful to an officer than inventing the number they asked for.

The solution

Four layers that form a loop: evidence, prevention, consequence, remedy. Each one removes an excuse for overriding the one before it.

Evidence reconstructs both eras of water from a single source so the comparison is symmetric, and draws the 1984-99 shoreline as a line over today's ground. Prevention screens any plot against a selectable buffer regime, reading the same rasters the map draws, pixel by pixel, with no server and no network call.

Consequence walks MERIT Hydro's flow-direction field downhill from the checked plot and reports receiving, never inundation. Remedy converts the displacement into a retention requirement in cubic metres and lists the land uses that can discharge it - it states a requirement and never recommends, because which option applies is the authority's decision.

DECISION 01

One source for both eras

Hand-differencing Landsat against Sentinel-2 cannot be made symmetric - the finer sensor finds more water whatever is on the ground, and that gap shows up as water appearing.

Both eras come from the JRC transition band, one method across the whole Landsat archive. 71.31 ha of loss in one catchment, defensible because the comparison is like for like.

DECISION 02

The model is never allowed to type a digit

A figure that cannot be traced to a source is indistinguishable from one that was invented.

The language model emits placeholders; the client substitutes measured values. Any bare numeral left in the prose is a validation failure and the answer is discarded.

DECISION 03

Deterministic first, model optional

A demo that depends on a network call is a demo that can fail on stage.

The deterministic composer renders first, always, before any network call. Pull the cable and the page behaves identically, minus one paragraph.

DECISION 04

Two hue families, not two shades

The first build drew both eras in blue and expected viewers to tell two decades apart by saturation. Nobody could, including the people who built it.

Water that survived is cyan; water that was lost is amber and hatched, carrying its 1984-99 shoreline as a drawn line. The chrome stays monochrome so every colour on screen belongs to a data layer or a verdict.

Execution

Measurements travel as bytes, not as colour - and the encoding is checked rather than assumed.

Four of the exported PNGs are never drawn. They carry real quantities packed into RGB channels, and the client reads them back pixel by pixel in an offscreen canvas. A distance field that a visualisation step quietly stretched would make every reported distance wrong and entirely plausible.

The flow-direction channel is categorical, which changes what can be checked. The rule that catches a collapsed distance field would fail a perfectly good direction layer, and passing it would prove nothing - a flow field can be entirely plausible and entirely wrong. So the test is physics instead: upstream area must be non-decreasing downstream. A transposed or averaged field breaks that immediately while still producing routes that look like routes.

WATER
JRC transition band, 1984-99 vs 2000-21
DRAINAGE
MERIT Hydro, 90 m, D8 routing
BUILT
Dynamic World
RETRIEVAL
84 chunks, BM25 + numeric triggers
VALIDATION
Byte-level encoding proof
BUILD
One HTML file, no build step, works offline

Impact

71.31 HECTARES OF LOST WATER IN ONE CATCHMENT, EVERY FIGURE CARRYING ITS SOURCE

71.31 ha

water lost in one catchment

35.9%

of the blue grid, gone

84

cited corpus chunks

Top 4

of 68 teams

Top 4 of 68 teams

Measured at the Plaksha finale, by building the tool that survives questioning rather than the one that impresses in the first thirty seconds.

Zero loops in 400 traced routes

Measured as upstream area being non-decreasing across 37,977 steps, by testing the flow field against physics instead of against a format rule that would have passed a wrong answer.

No accuracy number claimed

There is no surveyed encroachment dataset for this catchment, so there is no ground truth and no honest accuracy figure. What is reported instead is reproducibility against an independent method - pooled IoU 0.43-0.81, quoted as a range because which blocks are held out moves the result more than the threshold does.

What I learned

Refusing well is a product decision, not a limitation. The four things this tool declines to answer are named with the reason attached, and that turned out to be more useful to the people it is for than a confident number would have been. Every flag is a lead for ground verification, not a finding of fact - which is why it issues a certificate carrying every measurement and its uncertainty, rather than a score.

The palette was a real failure before it was a decision. We shipped a first build where both eras were blue and discovered nobody could read it, including us. Choosing a different hue family rather than a different shade was the fix, and it is the change that made the rest of the tool legible.